Climate Change Agreements
A voluntary agreement to meet efficiency targets, in exchange for 92% off the levy on electricity and 89% off on gas.
On a half-hourly supply the unit rate is only part of the bill. Capacity, network charges and levies sit behind it, and several of them carry reliefs a manufacturer may be entitled to. We start with your half-hourly data, check each charge, then buy the power on the right contract.
For factories, engineering works, food and drink production, and processing sites.
The four things we check on a manufacturing site before we price anything.
You pay a daily charge for every kVA held for the site, used or not. If your real peak sits well under the agreed figure, you're paying for headroom. Go over it and there's an excess charge instead.
A site in a Climate Change Agreement gets 92% off the levy on electricity and 89% off on gas. Without an agreement, or with the supplier certificate missing, it's charged in full.
Water that goes into product, cooling or steam never reaches the drain. The effluent bill should reflect what's really discharged, and a non-return allowance takes the rest off the sewerage charge.
On half-hourly sites the meter operator and data contracts are separate from the supply, and they quietly auto-renew. They're worth a look at every renewal.
A voluntary agreement to meet efficiency targets, in exchange for 92% off the levy on electricity and 89% off on gas.
Energy used in these processes is exempt from the main rates of the levy altogether. The relief is claimed through the supplier.
From April 2027 eligible manufacturers stop paying the Renewables Obligation and Feed-in Tariff costs in their electricity, with Capacity Market costs following in October 2027. The government puts it at up to a quarter off the bill. Eligibility goes by industry and product codes, site by site.
Around 500 of the most energy-intensive firms have had 90% off electricity network charges since April 2026, up from 60%.
Applications for the scheme's first year close at 11:59pm on 30 November 2026.
Your agreed capacity is on the bill, in kVA. So is the daily charge for it. Your half-hourly data shows the most you really drew.
Put the three in and see what the gap costs. Keep a margin when you reduce it: go over the agreed figure and the excess is charged, and capacity you give up may not be there if the site grows.
159 kVA of the 500 kVA you pay for sits above your peak and the margin. At 5p per kVA per day, that is £2,902 a year.
| Part of the agreed capacity | Capacity | Cost a year |
|---|---|---|
| Highest demand | 310 kVA | £5,658 |
| Margin kept | 31 kVA | £566 |
| Unused headroom | 159 kVA | £2,902 |
| Agreed capacity | 500 kVA | £9,125 |
Uses the three figures you enter and a 365-day year. A guide, not a quote. Any change to agreed capacity is made with the network operator.
Have the real data checkedFixed or bought in tranches across the term, with the non-commodity charges set out so you can see what moves.
Business electricity →Process and heating gas priced across the panel, with the annual quantity checked against real consumption.
Business gas →Consents, Mogden-formula charges, and whether you're paying for discharge you don't actually make.
Business water →Production waste, recycling and one-off clearances on one contract, with the transfer notes kept in order.
Business waste →Half-hourly data in a form you can use, and meter operator contracts checked at every renewal.
Metering →One recent invoice, and your authority for us to request the half-hourly data.
Capacity, levy and metering checked first. Then the full panel, fixed and flexible, side by side.
Paperwork, supplier chasing and the renewal diary. Nothing changes at the meter.
The maximum demand, in kVA, that the network operator holds available for your site. You pay a daily charge for each kVA whether you use it or not, and an excess charge if you go over.
The rules on this page were checked on 25 November 2026 against the published Climate Change Levy rates, GOV.UK guidance on exemptions from the Climate Change Levy, the government's announcement of the British Industrial Competitiveness Scheme, the scheme's guidance for applicants and the water industry's customer guidance on return to sewer allowances. It's general guidance, not tax or legal advice.
Pick yours and see where we look first. Not on the list? Send us one bill anyway.
See all industries →On a half-hourly supply the unit rate is only part of the bill. Capacity, network charges and levies sit behind it, and several of them carry reliefs a manufacturer may be entitled to. We start with your half-hourly data, check each charge, then buy the power on the right contract.
For factories, engineering works, food and drink production, and processing sites.
The four things we check on a manufacturing site before we price anything.
You pay a daily charge for every kVA held for the site, used or not. If your real peak sits well under the agreed figure, you're paying for headroom. Go over it and there's an excess charge instead.
A site in a Climate Change Agreement gets 92% off the levy on electricity and 89% off on gas. Without an agreement, or with the supplier certificate missing, it's charged in full.
Water that goes into product, cooling or steam never reaches the drain. The effluent bill should reflect what's really discharged, and a non-return allowance takes the rest off the sewerage charge.
On half-hourly sites the meter operator and data contracts are separate from the supply, and they quietly auto-renew. They're worth a look at every renewal.
A voluntary agreement to meet efficiency targets, in exchange for 92% off the levy on electricity and 89% off on gas.
Energy used in these processes is exempt from the main rates of the levy altogether. The relief is claimed through the supplier.
From April 2027 eligible manufacturers stop paying the Renewables Obligation and Feed-in Tariff costs in their electricity, with Capacity Market costs following in October 2027. The government puts it at up to a quarter off the bill. Eligibility goes by industry and product codes, site by site.
Around 500 of the most energy-intensive firms have had 90% off electricity network charges since April 2026, up from 60%.
{{n.t}}
Your agreed capacity is on the bill, in kVA. So is the daily charge for it. Your half-hourly data shows the most you really drew.
Put the three in and see what the gap costs. Keep a margin when you reduce it: go over the agreed figure and the excess is charged, and capacity you give up may not be there if the site grows.
{{cap.line}}
| Part of the agreed capacity | Capacity | Cost a year |
|---|---|---|
| Highest demand | {{cap.tMd}} | {{cap.cMd}} |
| Margin kept | {{cap.tMg}} | {{cap.cMg}} |
| Unused headroom | {{cap.tSp}} | {{cap.cSp}} |
| Agreed capacity | {{cap.tAc}} | {{cap.cAc}} |
{{n.t}}
Uses the three figures you enter and a 365-day year. A guide, not a quote. Any change to agreed capacity is made with the network operator.
Have the real data checkedFixed or bought in tranches across the term, with the non-commodity charges set out so you can see what moves.
Business electricity →Process and heating gas priced across the panel, with the annual quantity checked against real consumption.
Business gas →Consents, Mogden-formula charges, and whether you're paying for discharge you don't actually make.
Business water →Production waste, recycling and one-off clearances on one contract, with the transfer notes kept in order.
Business waste →Half-hourly data in a form you can use, and meter operator contracts checked at every renewal.
Metering →One recent invoice, and your authority for us to request the half-hourly data.
Capacity, levy and metering checked first. Then the full panel, fixed and flexible, side by side.
Paperwork, supplier chasing and the renewal diary. Nothing changes at the meter.
{{f.a}}
The rules on this page were checked on 25 November 2026 against the published Climate Change Levy rates, GOV.UK guidance on exemptions from the Climate Change Levy, the government's announcement of the British Industrial Competitiveness Scheme, the scheme's guidance for applicants and the water industry's customer guidance on return to sewer allowances. It's general guidance, not tax or legal advice.